Annual Paving Projects

Each year, the City of Morgantown paves selected streets. The Engineering Department is in charge of managing the contracts associated with this work.

The selection process involves input from several different sources. Citizen input, City staff recommendations, as well as an evaluation and rating system maintained by the Engineering Department. All of these factors contribute to the selection of streets to be paved in the paving season.

Streets that require paving, but have to be cut from the list due to budget constraints, get priority on the next year’s list. If you wish to make a recommendation for a street to be placed on the list, please contact the Engineering Division at 304-284-7412.

 

2017 Paving Project

The 2017 Paving Project is separated into two contracts with Anderson Excavating completing work on the north side of the city and Parrotta Paving completing work on the south side.

North Side Documents

South Side Documents

Paving List Paving List
Schedule Schedule (TBA)

Interactive Map


2016 Paving List